The mile long corridor was originally a V-ditch asphalt channel prone to overflowing with no way to filter runoff water. Spokane County addressed the problem with a new treatment area that includes 18 inches of bio-engineered topsoil and a wide palette of plant material.
This project incorporates a permanent public education element through interpretive entrance features at both ends of the project provided by Baldwin Signs using .375 Corten steel.